How to Set Up Dewatering Plan for Excavations?

[复制链接]
鲜花(133) 鸡蛋(3)
东南西北人 发表于 2018-3-28 06:00:39 | 显示全部楼层 |阅读模式

Procedures used for dewatering plans for an excavation includes selection of dewatering method, determination of hydraulic parameter, determination of the well capacity and Estimation the number of wells.


excavation-dewatering-plans-1.jpg

Fig.1: Dewatering Excavations


Set Up Dewatering Plan for Excavations1. Selection of Dewatering Method for Excavation

The selection of dewatering method is the first step to establish dewatering plan. Table 1 can be used to select suitable dewatering method based on the type of soil and excavation depth.


Different types of excavation dewatering system are shown from Figure 2 through Figure 6.


Table-1: Selection of dewatering method based on the type of soil and excavation depth
Dewatering methodsSuitable type of soilSuitable depth of excavation, m
Open sumpGravel (including fine, medium, and coarse), and coarse sandLess than 4
Well pointCoarse; medium; and fine sand, and fine gravel4-8
Vacuum well pointFine and medium sand, coarse and medium silt4-8
Electro-osmosisFine sand, coarse; medium; and fine silt4-8
Deep wellCoarse; medium; and gravel, coarse and medium sand20-24
Deep well+ auxiliary vacuum pumpsFine grave, coarse; medium; and fine sand, coarse and medium siltGreater than 28


open-sump-dewatering-system.jpg

Fig.2: Open Sump Dewatering System


well-point-dewatering-system.jpg

Fig.3: Well Point Dewatering System


electro-osmosis-dewatering-system.jpg

Fig.4: Electro-Osmosis Dewatering System


deep-well-excavation-system-2.jpg

Fig.5: Deep Well Excavation System


deep-well-excavation-system.jpg

Fig.6: Deep Well Excavation System


2. Determination of Hydraulic Parameter

There are number of hydraulic parameters that need to be evaluated based on the formula used. For example, it is required to evaluate coefficient of permeability solely if equilibrium formula such as Thiem’s equilibrium equation is used.


Coefficient of permeability can be computed using pumping tests, falling head test, constant head test, or empirical formula. The most acceptable technique for coefficient of permeability is empirical formula and pumping tests.

Filling head and constant head tests are not desirable because the disturbance of the samples would prevent fully represent the in-situ soil.


If un-equilibrium equation is used for instance Theeis’s and Jacob equation, then coefficient of transmissivity and coefficient of storage need to be computed.


The coefficient of transmissivity is equal to the coefficient of permeability times the thickness of aquifer. The coefficient of storage ranges from 0.0005 to 0.001.


3. Determination of Well Capacity

It is considerably significant to evaluate the capacity of the well since it is the base for the design and cost of dewatering process execution.


Empirical formula has been developed to estimate the capacity of the well. The equation can be expressed as follow:

well-capacity-formula.jpg

Where:

Qw: Well discharge capacity, m3/s

hw: Groundwater level at which groundwater flows into the well as it is explained in Figure 1, m

rw: Radius of the well, m

k: Coefficient of permeability


It should be known that, the evaluation of hw is very difficult, that is why it is acceptable to assume that hw is equal to the groundwater level in the deep well at the preliminary estimation.


Because the computations of well capacity have substantial significant, that is why the provision of a safety factor is highly recommended. It is possible to calculate well capacity using step drawdown pumping test which more reliable than the value obtained from empirical formula.


capacity-of-dewatering-well.jpg

Fig.7: Capacity of Well


4. Estimation of Number of Wells

Generally, groundwater level shall be lowered around 0.5 to 1m below the bottom of excavation so as to keep the bottom of excavation dry. This cannot be achieved unless required numbers of wells are placed.


Steps required to be taken to estimate number of wells include:

  • The calculation of total quantity of water required to be pumped using either equilibrium or non-equilibrium empirical equation as discussed above (determination of hydraulic parameters).
  • Compute the capacity of each wells using equation 1 explained in the above section.
  • Compute the number of wells by dividing total amount of water needed to be pumped by the capacity of single well.

excavation-dewatering-wells.jpg

Fig.8: Dewatering Wells Installed in an Excavation


鲜花(133) 鸡蛋(3)
 楼主| 东南西北人 发表于 2018-3-28 06:02:36 | 显示全部楼层
鲜花(4) 鸡蛋(0)
sjzdh 发表于 2018-3-28 06:53:57 | 显示全部楼层
鲜花(16) 鸡蛋(0)
jangy1974 发表于 2018-3-28 08:40:36 | 显示全部楼层
鲜花(50) 鸡蛋(0)
xmgao9996 发表于 2018-3-28 20:24:28 | 显示全部楼层
学习了,能否打个包,谢谢!
鲜花(69) 鸡蛋(0)
zspkd 发表于 2018-3-28 22:30:10 | 显示全部楼层
鲜花(30) 鸡蛋(0)
wxysaeed 发表于 2018-3-29 03:50:20 | 显示全部楼层
鲜花(0) 鸡蛋(0)
hwf222 发表于 2018-3-30 00:11:17 | 显示全部楼层
鲜花(4) 鸡蛋(0)
CHJ1997-2008 发表于 2018-4-3 23:02:06 | 显示全部楼层
学习学习,多谢!
鲜花(1) 鸡蛋(0)
tt-dd 发表于 2018-4-4 08:01:33 | 显示全部楼层
开心.只有开心度过每一天,活得才精彩。
鲜花(6) 鸡蛋(0)
zhoukui-sh 发表于 2018-4-4 08:29:10 | 显示全部楼层
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|关于我们|QQ即时充值|站点统计|手机版|小黑屋|百宝箱|留言|咨询|微信订阅|QQ189615688|东南西北人

GMT+8, 2019-11-17 23:32 , Processed in 0.226475 second(s), 54 queries .

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表